Market closed· · CAD · Data may be delayed
Prices may be delayed and are for informational purposes only - not investment advice.
Total return, dividends included.
Where the price sits against its 50- and 200-day moving averages.
Makkler Fair Value, financial health score, analyst view, peers and MakklerAI.
Toronto, Ontario--(Newsfile Corp. - September 17, 2026) - Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint") today reported radiometric results from the completed 2026 summer drill program at the 50/50 Dorado Joint Venture ("Dorado" or the "Project") with IsoEnergy Ltd. (NYSE American: ISOU) (TSX: ISO), located in Saskatchewan's Athabasca Basin. Drill hole PG26-11, the first hole completed at the Q24 target, intersected 7.4 metres averaging 8,760 counts per second ("cps")...
Purepoint Uranium Group CEO Chris Frostad joined Steve Darling from Proactive reported encouraging new assay results from its 2026 winter drill program at the Nova Target, part of the 50/50 Dorado Joint Venture with IsoEnergy Ltd., further strengthening the project's potential as a significant uranium discovery in Saskatchewan's Athabasca Basin. Frostad shared with Proactive the latest results, highlighting that Hole NV26-05 returned 1.65% U₃O₈ over 0.3 metres from a depth of 390.4 metres at the unconformity. The intercept adds to a growing body of evidence supporting the presence of uranium
IsoEnergy Ltd. ("IsoEnergy", or the "Company") (NYSE American: ISOU); (TSX: ISO) is pleased to report on radioactive zones intersected in summer drilling along the Hurricane South Trend on the Larocque East project (the "Project"), which hosts the high-grade Hurricane deposit ("Hurricane" or the "Deposit"). Summer drilling at Larocque East totaled 10,159 m in 26 holes, for a year-to-date total of 16,963 m in 43 drill holes (Figure 1). The summer program was expanded from a planned 8,000 m, 20-ho
Recent third-party headlines about this company, kept separate from Makkler's own editorial coverage and linking out to the publisher. Accuracy is the publisher's responsibility.